Case Studies

Westin La Paloma Resort

Problem

Nu Flow Tucson was contacted to inspect the 6 inch sewer main located in
the basement kitchen and offered an alternative solution to a traditional repair.
Upon inspection, it was discovered that the main sewer line is cast iron, had cracks,
severely corroded with heavy buildup and debris, and in failing condition causing
back ups and slow draining.

Solution

Nu Flow Tucson rehabilitated the existing sewer pipe using our Nu-Drain, “no-dig”, pull in place structural liner, up to 200 feet of 8 inch. Effectively extending the service life of the sewer pipe an expected 100 years. To prevent disturbance to the resort business hours, the project was completed in 5 nights.
Looking for an Immediate Quote?
OR

Homeowner Opts for Nu Flow Phoenix over Traditional Repipe

Problem

Nu Flow was contacted to verify the conditions of the cast iron and Orangeburg sewer wastewater system through the roof vents. Nu Flow identified that the cast iron main is cracking, scaling, and accumulating debris. The Orangeburg pipes are blistering, cracking, and also accumulating debris. There were no clean-outs for the residence, and their installation would be necessary for the cleaning and lining process.

Solution

Customer decided to go with Nu Flow because of they didn’t want any destruction to their property. To avoid trenching their entire yard
Nu Flow came in and lined their Main Sewer line and Outside Main Sewer System.

After Lining with Nu Flow Phoenix

Maryvale BallPark

NuFlow Phoenix was contacted to perform a camera inspection of the sewer pipes located at the Maryvale Ballpark in Phoenix, Arizona. The customer was experiencing issues with their sewer pipes and wanted a solution.

This system is a 65 feet of 6” inch cast iron pipe. The pipe runs from the access created by the customer on the east side of the building to the clean-outs.

The Problem

NuFlow Phoenix was contacted to perform a camera inspection of the sewer pipes located at the Maryvale Ballpark in Phoenix, Arizona. The customer was experiencing issues with their sewer pipes and wanted a solution.

The NuFlow Solution

Nu Flow rehabilitated the existing sewer pipe in two days without downtime or closure using our NuDrain no-dig pull in place structural liner. The 65 feet of the 6” inch cast iron sewer main for the building was repaired, extending the service life of the sewer pipes an expected 100 years.

If this customer had chosen a traditional pipe repair, the business would have been closed down for several days. Flooring and concrete slab would have been torn apart and removed for a traditional repipe. A messy re-pipe would have been more expensive and much more inconvenient than Nu Flow’s unique solution.

Click to Call!